Plan toward a verified outcome

Outcome-led planning keeps the result you want as the reference point while the plan changes through delivery and learning. The outcome is the objective.

Install planning and arrange the required reviews, then invoke:

/wr-planning:outcome-led-planning

For an installed Codex plugin, use $wr-planning:outcome-led-planning. Describe the result you want and any constraints you already know.

Planning installs independently of ITIL and has no hooks or bundled reviewer agents. Existing ITIL planning commands and personal $outcome-led-planning skills remain usable; you do not need to remove them to install this plugin.

The skill uses SMART: specific, measurable through observable evidence, achievable against known constraints, relevant to your job, and time-bound. Qualitative evidence can establish completion; arbitrary numerical targets are not required.

If information is missing, the agent asks one focused question and waits for your answer. It uses existing context before asking for details again. If you decline a deadline, it records that exception rather than inventing one. The agent preserves your stated timing. When the outcome is ready for confirmation, it asks you to confirm or change that playback before discussing implementation choices.

Before executable planning, the agent plays back the complete objective, completion evidence and material constraints. Confirm it or suggest changes. A substantive later change to the objective requires confirmation again; ordinary replanning of the means does not.

Conversation or local planning remains available. For shared work, you can choose GitHub Issues tracking after confirming the outcome. The agent honors an existing choice; when a choice is needed, it asks one question and waits. It does not ask again just because a different agent joins or a session resumes. Without an existing GitHub choice or evidence that shared coordination adds value, the agent keeps conversation or local tracking.

The full coordination requirements in this guide use planning 0.3.0 or later, or the ITIL compatibility command in 3.3.0 or later. Update your installed plugin before relying on it.

The agent reads a bundled coordination protocol when GitHub tracking is selected. The linked issues become the shared plan. An optional GitHub Project mirrors those same issues. Existing architecture decisions, jobs and risk policies continue to govern their own domains. Moving a local plan into Issues requires a recorded handover and current revision, so agents retain one source of planning authority.

  • Outcome: the confirmed SMART result, completion evidence, constraints, timeframe and increment links. Its owner keeps the goal clear and replans.
  • Increment: one coherent result, its plan revision, acceptance criteria, assumptions, dependencies, reviews and contribution tasks. Its owner coordinates delivery and verifies the whole increment.
  • Task: one agent’s bounded contribution, with its parent increment, current plan revision, scope, dependencies, account and distinct agent or session identity, status and evidence.

Record an owner for every outcome, increment and task, or state that ownership is unresolved. A child issue does not inherit its parent’s owner.

Horizon means Now, Next or Later and belongs to planned or active increments. Status describes execution, such as in progress, blocked or done. For example, a Now increment waiting for input has Horizon: Now and Status: blocked. It does not become Next automatically. Outcomes and tasks have no Horizon. Completed or superseded increments leave active horizons while retaining history.

Use native sub-issues where supported. When another task supplies a required result, create and verify its native dependency where tools and permissions support it. This includes prerequisites for a later stage or task completion. Name the exact unlock condition and required evidence. Useful preparation can remain Ready or In progress while those dependencies stay open; verify the prerequisite before the dependent stage or completion.

When a native relationship is unavailable or denied, use reciprocal links and record the exact limitation. Read back saved records before claiming a relationship or update succeeded.

A prerequisite task must not require its dependent task’s result to finish. Propose corrections in the increment thread. The increment owner records revised task boundaries and acceptance with affected task owners before applying them. Give each task an independently verifiable result and retain the combined result in increment acceptance. Obtain architecture, Jobs To Be Done (JTBD), and risk reviews before executing a materially revised plan.

The contributing agent uses its own authorized account and follows these steps.

  1. Read the outcome, current increment revision, shared discussion, existing tasks and dependencies. Check for overlapping work and stale assumptions.
  2. Hold only one contribution task at a time, including a blocked assignment. Finish it, explicitly hand it over or release it before claiming another. Do not reserve queued tasks. Outcome or increment coordination ownership does not reserve contribution tasks.
  3. Claim a separately owned contribution within the authorized, reviewed plan. Assign its task to your actual GitHub account and record the particular agent or session. Two agents sharing an account remain distinct contributors. If assignment is unavailable, record the account and agent or session in the task, state the exact limitation, and verify the saved record before contributing.
  4. Record scope, parent, revision and dependencies, including when there are none. Verify the saved claim and links, then recheck competing claims before implementation. Claims are cooperative; they are not atomic locks.
  5. Agree an explicit split or handoff before taking over someone else’s work. An old claim does not grant ownership. Small internal steps can remain a checklist instead of becoming separate task issues.
  6. Attach completion evidence to the task and hand off cross-task results in the increment thread. A finished task does not by itself finish the increment or outcome.

Mark a task Blocked only when no useful, authorized next step remains within its scope because a required input or capability is unavailable. Investigable facts, obtainable reviews and later-stage prerequisites do not block useful current preparation. Do not invent speculative work to avoid Blocked.

Reassess available inputs and useful authorized in-task work before releasing a blocked assignment. A stored Blocked status alone does not establish exhaustion. Continue useful work; release with a handover only when the required input is unavailable and no useful in-task step remains. Record the blocker, evidence and next step. Keep the blocked task Blocked and unassigned. Leave independently actionable work Ready/Unclaimed so another agent can contribute.

Each contributor uses their own existing access. Assignment does not grant additional permissions. When an existing Project is selected, verify its actual Status and Agent fields. Labels and issue-body text do not establish Project field values. Use available authorized tools, a CLI or an authorized operator, then read back the saved fields. Record a pending mirror update honestly and continue useful issue-side work.

Keep task scope, ownership, status, dependencies, next action and verified evidence current. Coordinate replaced or dropped work with the increment owner and affected task owners. Close redundant tasks as not planned, with reasons and successor links. Preserve required acceptance evidence and prerequisites before removing an obsolete dependency; verify saved changes.

Keep task-local details on the task. Use the increment issue’s discussion for cross-task requests, blockers, findings, handoffs and proposed plan changes. Include the agent or session, task and dependency links, current revision, recipient, concrete request and relevant evidence. The recipient acknowledges and links the task that will address the request; the dependent owner verifies returned evidence before clearing a blocker.

Use communication channels the user has authorized. Choosing a tracker does not independently authorize messages to people or other sessions. Keep private chats, credentials and sensitive customer details out of shared threads.

Read relevant increment comments regularly throughout coding and waiting, and before dependent actions, pushes, scope or ownership changes and handovers. Acknowledge handoffs and answer questions affecting owned work through authorized channels. Agree and record a bounded cadence for the active work window; a suggested interval remains a proposal until agreement and its saved record are established. Pending agreement does not suspend authorized bounded checks or existing action checkpoints. A posted message does not prove recipient acknowledgement. Comments and mentions do not guarantee an idle agent wakes. Standing pollers, scheduled jobs and orchestration services need explicit authorization.

After a verified increment, compare its evidence with the overall outcome and record what you learned. Rewrite the plan from the remaining gap: reorder, replace, split or drop increments instead of automatically promoting old Next. Update active horizons and the optional Project mirror, preserving history and recording any update that could not be made.

Obtain architecture, JTBD and risk reviews before executing a materially revised plan. A scoped contribution inside the existing assessed revision does not need another full planning cycle. Close the outcome only when its confirmed evidence is satisfied. A tidy board or all tasks marked done cannot replace that result.

Read the full GitHub planning requirements.

  • Now: one coherent increment with scope, assumptions, verification and a clear delivery boundary. INVEST checks that it is independently deliverable, negotiable within the confirmed goal, valuable, estimable, small and testable.
  • Next: provisional subsequent increments, with less detail.
  • Later: broad direction where uncertainty remains highest.

Choose the smallest result that is useful on its own. State who benefits and the observable improvement, validated decision or capability they receive. Split Now again if a smaller result still provides business value. Shared code does not justify bundling separate useful results.

Keep the security, integrity, recovery and acceptance checks needed for that result. A completed technical activity alone is insufficient. Promotion from test to production is a delivery process; its stages do not automatically become separate increments. A foundation needs explicit value and limits. Deliver the verified minimum, then replan before adding work. Repeat this size check whenever Now changes.

When uncertainty prevents a bounded implementation increment, choose focused discovery or qualification. Define a finite inspection pass, concrete output and stopping condition. Give the pass itself a qualitative effort estimate grounded in that limited scope; keep later implementation uncertainty separate. Record unavailable inputs precisely and continue useful authorized alternatives. Authorized preliminary reading can inform the plan; executing a formal discovery increment still requires its reviews.

INVEST does not require story documents unless your project already requires them. Architecture, JTBD and risk reviewers assess every executable plan revision. Substantive failures are resolved before dependent work. When a required independent review is unavailable, hold dependent implementation and continue useful authorized preparation. An ordinary go-ahead does not supply that review or waive the requirement.

The agent treats a recoverable failure as a problem to solve: diagnose it, use an available equivalent or make a bounded reversible repair, and continue useful independent work. It adapts the means while preserving the confirmed outcome and required evidence.

Routine choices do not need another approval. Real gaps in authority or capability still need a precise handoff after useful authorized alternatives have been exhausted. Required reviews still apply to materially revised plans.

Use the project’s established delivery and environment-promotion process. Planning does not add speculative operator preflights, predicted resource or diff allowlists, approval gates, scripts or pipelines. Preserve required checks, inspect actual results, and investigate observed interference or material risk.

After each delivered increment, compare actual evidence with both that increment and the overall objective. Retain useful learning, revise the remaining plan and obtain fresh reviews before the next dependent increment. Failed verification does not count as delivery.

The agent stops when the objective’s evidence is satisfied, or reports the exact remaining blocker after exhausting useful authorized work. A commit, green CI or publication establishes only its own stage.